Friday, November 2, 2012

I love it when a plan comes together

Well, we are quickly preparing for the renovation of the tub and shower in the main bathroom.  I am scurrying around and gathering up the needed supplies.
The grout has cracked around the tub and there has been water infiltration behind the tile so we need to change the tile out.  The quickest and cheapest solution is to install a tub surround.  Karalee wants a taller tub, so now is the time to change that out.  The faucet system is the old two handle system and with the younger children we want to change that to the pressure balanced one handle faucet. 
I have never changed or installed a tub before so this will be a learning experience, I have participated in installing a tub surround before. 
Along with the tub surround change we will need to retile the floor, paint the new drywall and install the new toilet that we have had since we moved in. 
We will be taking pictures and posting them up after the work is complete.  It is going to be a busy weekend. 

No comments:

Post a Comment